{"id":210363,"date":"2019-03-06T13:15:52","date_gmt":"2019-03-06T16:15:52","guid":{"rendered":"https:\/\/anba.com.br\/?p=210363"},"modified":"2019-06-30T18:00:25","modified_gmt":"2019-06-30T21:00:25","slug":"brazilian-ministry-announces-energy-auctions-until-2021","status":"publish","type":"post","link":"https:\/\/anba.com.br\/en\/brazilian-ministry-announces-energy-auctions-until-2021\/","title":{"rendered":"Brazilian ministry announces energy auctions until 2021"},"content":{"rendered":"<p>Bras\u00edlia \u2013 Brazilian Ministry of Mines and Energy (MME) published this Wednesday (6) in Di\u00e1rio Oficial da Uni\u00e3o (DOU) decrees number 151 and 152, published in section 1, with a schedule of auctions to buy electric power from new enterprises and existing production to be held this year and the next two, in the period from 2019 to 2021.<\/p>\n<p>The following auctions to buy new energy are predicted: in 2019, auction A-4 on June 27 and auction A-6 on September 26. For 2020, auction A-4 should be promoted on April 23 and auction A-6 on September 24. For 2021, auction A-4 is to be held on April 29 and auction A-6 on September 30.<\/p>\n<p>To hire existing generation power, the estimated timeline says: in 2019, auctions A-1 and A-2 on December 6. For 2020, auctions predictions are auctions A-1 and A-2 on December 4; and 2021, auctions A-1 and A-2 on December 3<sup>rd<\/sup>.<\/p>\n<p><strong>Translated by Guilherme Miranda<\/strong><\/p>\n<div class=\"credits-overlay\" data-target=\".wp-image-210369\">Press Release<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Two auctions to hire new energy are predicted to 2019, two to 2020, and another two to 2021, according to Brazilian Ministry of Mines and Energy.<\/p>\n","protected":false},"author":2315,"featured_media":210369,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[91],"tags":[34179,7659,3875,2282],"class_list":{"0":"post-210363","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-economy","8":"tag-energia-en","9":"tag-energy-auction","10":"tag-ministry-of-mines-and-energy","11":"tag-power"},"wps_subtitle":"Two auctions to hire new energy are predicted to 2019, two to 2020, and another two to 2021, according to Brazilian Ministry of Mines and Energy.","_links":{"self":[{"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/posts\/210363","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/users\/2315"}],"replies":[{"embeddable":true,"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/comments?post=210363"}],"version-history":[{"count":0,"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/posts\/210363\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/media\/210369"}],"wp:attachment":[{"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/media?parent=210363"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/categories?post=210363"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/tags?post=210363"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}