{"id":21740,"date":"2006-08-29T16:59:00","date_gmt":"2006-08-29T18:59:00","guid":{"rendered":"https:\/\/escaesco.com.br\/lab\/anba\/plant-to-produce-10-of-the-energy-consumed-in-manaus\/"},"modified":"2019-06-30T18:21:21","modified_gmt":"2019-06-30T21:21:21","slug":"plant-to-produce-10-of-the-energy-consumed-in-manaus","status":"publish","type":"post","link":"https:\/\/anba.com.br\/en\/plant-to-produce-10-of-the-energy-consumed-in-manaus\/","title":{"rendered":"Plant to produce 10% of the energy consumed in Manaus"},"content":{"rendered":"<p><P><STRONG>Ag\u00eancia Brasil*<\/STRONG><\/P><br \/> <P>Manaus &#8211; The first financing contract of the Development Fund of the Amazon (FDA), signed yesterday (28), is going to help build a thermo-electric plant that will produce 81,250 kilowatts of energy in Manaus, capital city of the Brazilian Northern state of Amazonas. &quot;This represents 10% of the energy consumed in Manaus, including residential, commercial and industrial use,&quot; explained the president of the Energy Generating Plant of Amazonas (Gera), Lauro Fi\u00faza.<\/P><br \/> <P>Gera is carrying out the construction work in the Thermo-electric Plant of Ponta Negra, which has a total cost of US$ 108.9 million. Out of this value, only US$ 24.6 million are resources from the company itself &#8211; US$ 21.1 million is from the Constitutional Fund of the North (FNO) and US$ 63.2 million from the FDA.<\/P><br \/> <P>&quot;Construction works started in December. The plant is ready, the equipment have arrived from Italy. We are in the assembly phase,&quot; informed Fi\u00faza. &quot;In 60 days, we expect to be operating already, with heavy oil. When the Coari-Manaus gas pipe is ready (the forecast by the federal government is for march 2008) we should use natural gas. We already have a contract with Manaus Energia for this.&quot;<\/P><br \/> <P><STRONG>*Translated by Silvia Lindsey<\/STRONG><\/P><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Ag\u00eancia Brasil* Manaus &#8211; The first financing contract of the Development Fund of the Amazon (FDA), signed yesterday (28), is going to help build a thermo-electric plant that will produce 81,250 kilowatts of energy in Manaus, capital city of the Brazilian Northern state of Amazonas. &quot;This represents 10% of the energy consumed in Manaus, including<\/p>\n","protected":false},"author":2311,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[95],"tags":[],"class_list":{"0":"post-21740","1":"post","2":"type-post","3":"status-publish","4":"format-standard","6":"category-innovation"},"wps_subtitle":"","_links":{"self":[{"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/posts\/21740","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/users\/2311"}],"replies":[{"embeddable":true,"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/comments?post=21740"}],"version-history":[{"count":0,"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/posts\/21740\/revisions"}],"wp:attachment":[{"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/media?parent=21740"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/categories?post=21740"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/tags?post=21740"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}