{"id":28573,"date":"2008-09-14T07:00:00","date_gmt":"2008-09-14T09:00:00","guid":{"rendered":"https:\/\/escaesco.com.br\/lab\/anba\/minister-says-brazil-to-have-up-to-60-nuclear-plants\/"},"modified":"2024-02-21T22:29:21","modified_gmt":"2024-02-22T01:29:21","slug":"minister-says-brazil-to-have-up-to-60-nuclear-plants","status":"publish","type":"post","link":"https:\/\/anba.com.br\/en\/minister-says-brazil-to-have-up-to-60-nuclear-plants\/","title":{"rendered":"Minister says Brazil to have up to 60 nuclear plants"},"content":{"rendered":"<p>Rio de Janeiro \u2013 The Brazilian minister of Mines and Energy, Edison Lob\u00e3o, stated today (12), in Angra dos Reis, that Brazil has already set as a priority the resumption of its nuclear programme, and that it should build from 50 to 60 nuclear plants over the next 50 years \u2013 with capacity for generating approximately 1,000 megawatts per unit.<\/p>\n<p> The minister made the statement during a visit to the site in which the plant Angra 3 is going to be built. According to the forecasts of the ministry, it should enter into operation within five years.<\/p>\n<p> The unit will be able to generate 1,405 megawatts of energy at full capacity. This month, the area that is going to house the construction site and the new thermal plant will start being prepared.<\/p>\n<p> &quot;The problem that arose in Bolivia provides further evidence that we will have to resume our nuclear programme. The president [Luiz In\u00e1cio Lula da Silva] reckons that the nuclear policy is a priority for Brazil, and Angra 3 is a personal decision made by the president \u2013 based on a decision of the CNPE [National Council for Energy Policies].&quot;<\/p>\n<p> Lob\u00e3o called attention to the fact that the construction has already been defined of four new nuclear units \u2013 (two in the Southeast and other two in the Northeast), with capacity for generating approximately 1,000 megawatts each.<\/p>\n<p> &quot;In the Northeast, several states have expressed interest in housing the plants, among them Pernambuco, Alagoas, Sergipe and Bahia \u2013 they all want the plants. In the Southeast, no interest has yet been shown. However, there is a programme underway that will be submitted to the CNPE for the construction of other units, totalling 60,000 megawatts.&quot;<\/p>\n<p> After stating that the country has an installed capacity of 100,000 megawatts, the minister claimed that there are not going to be any obstacles to obtaining previous licensing in order to begin construction work of the Angra 3 plant.<\/p>\n<p> &quot;There is no doubt that the licensing will not be a problem, and the plant will be built in five years. During this period, all of the necessary legal procedures will be taken care of. The requirements of the Ministry of the Environment total to 60 and all of them, as I said before, are either being catered to or will be met over the course of construction. There is not a chance that the plant will not be built as a consequence of these requirements.&quot;<\/p>\n<p> Lob\u00e3o stated once again that Brazil stores its nuclear waste in an inadequate manner. With regard to the demand for the country to have a definitive site for storing such waste, the minister asserted that no country has a site of that kind.<\/p>\n<p> &quot;We are storing our waste adequately and there is not, in any country in the world, a definitive waste storage site. A French delegation has recently visited our premises and approved of our procedures \u2013 they regarded them as adequate. And they possess vast experience in the topic. Nevertheless, we are going to improve even further,&quot; stated the minister.<\/p>\n<p> <b>*Translated by Gabriel Pomerancblum<\/b><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Edison Lob\u00e3o, for Mines and Energy, stated that the country is going to build from 50 to 60 plants over the next 50 years. He made the statements when visiting the site in which Angra 3 will be built.<\/p>\n","protected":false},"author":2315,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[91],"tags":[],"class_list":{"0":"post-28573","1":"post","2":"type-post","3":"status-publish","4":"format-standard","6":"category-economy"},"wps_subtitle":"Edison Lob\u00e3o, for Mines and Energy, stated that the country is going to build from 50 to 60 plants over the next 50 years. He made the statements when visiting the site in which Angra 3 will be built.","_links":{"self":[{"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/posts\/28573","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/users\/2315"}],"replies":[{"embeddable":true,"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/comments?post=28573"}],"version-history":[{"count":0,"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/posts\/28573\/revisions"}],"wp:attachment":[{"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/media?parent=28573"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/categories?post=28573"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/tags?post=28573"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}