{"id":35925,"date":"2010-09-17T18:15:00","date_gmt":"2010-09-17T20:15:00","guid":{"rendered":"https:\/\/escaesco.com.br\/lab\/anba\/brazil-to-issue-tenders-for-10-plants-this-year\/"},"modified":"2024-02-21T22:28:36","modified_gmt":"2024-02-22T01:28:36","slug":"brazil-to-issue-tenders-for-10-plants-this-year","status":"publish","type":"post","link":"https:\/\/anba.com.br\/en\/brazil-to-issue-tenders-for-10-plants-this-year\/","title":{"rendered":"Brazil to issue tenders for 10 plants this year"},"content":{"rendered":"<p>S\u00e3o Paulo \u2013 The president of the Brazilian Energy Research Company (EPE), Maur\u00edcio Tolmasquim, said this Friday (17th) that the government intends to hold another auction this year for construction and operation of ten hydroelectric plants.<\/p>\n<p> &quot;We are working for it, but of course the time is short, and it all depends on whether the [environmental] license will be issued on time,&quot; said Tolmasquim shortly after presenting the EPE&#8217;s planning for 2010 to 2019 to the Board of Infrastructure of the Federation of Industries of the State of S\u00e3o Paulo (Fiesp).<\/p>\n<p> Out of the ten new plants, five will be built on the Parna\u00edba River, at the border between the states of Piau\u00ed and Maranh\u00e3o; four on the Teles Pires River Basin, in Mato Grosso; and one \u2013 the Riacho Seco Hydroelectric Plant \u2013 on the S\u00e3o Francisco River Basin, at the border of Bahia and Pernambuco.<\/p>\n<p> &quot;We want to hold the auction by mid-December, in the worst-case scenario. For such, we must issue the edict by mid-November. Therefore, it would be best if the licenses were issued before the edict is published, but we are going to check whether it is feasible to obtain the license near the auction&#8217;s date,&quot; said Tolmasquim.<\/p>\n<p> The president of the EPE also claimed that he is speaking to representatives of the Brazilian Environment and Renewable Natural Resource Institute (Ibama), of the state secretariats for environment, and of the National Indian Foundation (Funai) to try and speed up the licensing processes. &quot;We are taking action quickly to see if they will act fast too, so that we can make it on time,&quot; said Tolmasquim.<\/p>\n<p> He informed that on the 10th this month, the government submitted to the Federal Court of Audits the impact studies for the plants of Teles Pires, Sinop and S\u00e3o Manuel, in the Teles Pires River Basin, and for Riacho Seco, in the S\u00e3o Francisco River. The studies for the other ventures should be submitted by October 10th.<\/p>\n<p> <b>*Translated by Gabriel Pomerancblum<\/b><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The information was supplied this Friday by the president of the Energy Research Company, Maur\u00edcio Tolmasquim. The hydroelectric plants will be built in the Northeast and Midwest regions.<\/p>\n","protected":false},"author":2315,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[91],"tags":[],"class_list":{"0":"post-35925","1":"post","2":"type-post","3":"status-publish","4":"format-standard","6":"category-economy"},"wps_subtitle":"The information was supplied this Friday by the president of the Energy Research Company, Maur\u00edcio Tolmasquim. The hydroelectric plants will be built in the Northeast and Midwest regions.","_links":{"self":[{"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/posts\/35925","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/users\/2315"}],"replies":[{"embeddable":true,"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/comments?post=35925"}],"version-history":[{"count":0,"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/posts\/35925\/revisions"}],"wp:attachment":[{"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/media?parent=35925"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/categories?post=35925"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/tags?post=35925"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}