{"id":392794,"date":"2025-07-31T16:44:40","date_gmt":"2025-07-31T19:44:40","guid":{"rendered":"https:\/\/anba.com.br\/?p=392794"},"modified":"2025-07-31T16:44:43","modified_gmt":"2025-07-31T19:44:43","slug":"jordan-extends-solar-farm-tender","status":"publish","type":"post","link":"https:\/\/anba.com.br\/en\/jordan-extends-solar-farm-tender\/","title":{"rendered":"Jordan extends solar farm tender"},"content":{"rendered":"\n<p>S\u00e3o Paulo \u2013 Jordan\u2019s Ministry of Energy and Mineral Resources (MEMR) has pushed back from July 15 to August 12 the deadline for submission of letters of intent to bid in a tender to build a solar power plant in the Arab country.<\/p>\n\n\n\n<p>According to information from the Ministry made available by the Embassy of Jordan in Brazil, the project entails the construction of a 200-megawatt solar power plant. The location will be made known once bids are submitted.<\/p>\n\n\n\n<p>Bidders may include businesses or consortia capable of building and operating the solar farm, which will be connected to the national energy system operated by Nepco. Additional information is available<a href=\"https:\/\/www.memr.gov.jo\/En\/TendersDetails\/202505151\" target=\"_blank\" rel=\"noopener\"> here<\/a>.<\/p>\n\n\n\n<p>Read also:<br><a href=\"https:\/\/anba.com.br\/en\/brazils-firms-opened-doors-for-business-in-jordan\/\">Brazil\u2019s firms opened doors for business in Jordan<br><\/a><\/p>\n\n\n\n<p><strong>Translated by Gabriel Pomerancblum\u00a0<\/strong><\/p>\n<div class=\"credits-overlay\" data-target=\".wp-image-392795\">\u00a9 Khalil Mazraawi\/AFP<\/div>","protected":false},"excerpt":{"rendered":"<p>The new deadline for submission of letters of intent is August 12. Bidders are required to prove technical ability to build and operate a solar power plant.<\/p>\n","protected":false},"author":2316,"featured_media":392795,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[107],"tags":[6808,22646,34179,27311],"class_list":{"0":"post-392794","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-business-opportunities","8":"tag-arabe-en-2","9":"tag-embaixada-en","10":"tag-energia-en","11":"tag-jordania-en-2"},"wps_subtitle":"The new deadline for submission of letters of intent is August 12. Bidders are required to prove technical ability to build and operate a solar power plant.","_links":{"self":[{"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/posts\/392794","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/users\/2316"}],"replies":[{"embeddable":true,"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/comments?post=392794"}],"version-history":[{"count":0,"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/posts\/392794\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/media\/392795"}],"wp:attachment":[{"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/media?parent=392794"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/categories?post=392794"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/tags?post=392794"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}