{"id":40854,"date":"2012-03-07T18:11:00","date_gmt":"2012-03-07T20:11:00","guid":{"rendered":"https:\/\/escaesco.com.br\/lab\/anba\/development-bank-approves-us-295-mn-in-wind-energy-credit\/"},"modified":"2024-02-21T22:28:07","modified_gmt":"2024-02-22T01:28:07","slug":"development-bank-approves-us-295-mn-in-wind-energy-credit","status":"publish","type":"post","link":"https:\/\/anba.com.br\/en\/development-bank-approves-us-295-mn-in-wind-energy-credit\/","title":{"rendered":"Development Bank approves US$ 295 mn in wind energy credit"},"content":{"rendered":"<p>S\u00e3o Paulo \u2013 This Wednesday (7th), the Brazilian Development Bank announced the approval of a line of credit worth 389 million reals (US$ 295 million) for the building of five wind farms in Northeast Brazil, being four in the state of Rio Grande do Norte and one in the state of Bahia.<\/p>\n<p> According to the bank, the combined installed capacity of the farms will be 139 megawatts. The undertakings will be controlled by Neoenergia and Iberdrola Renov\u00e1veis do Brasil. The line of financing represents 67.8% of total investment, which will be 573.6 million reals (US$ 435.3 million), and includes the power transmission network.<\/p>\n<p> Still according to the bank, investment in wind energy in Brazil stood at 5.1 billion reals (US$ 3.8 billion) in 2011, of which 3.4 billion reals (US$ 2.5 billion) were financed by the institution. The figure translates into an additional 1,160 megawatts in the Brazilian power system.<\/p>\n<p> <b>*Translated by Gabriel Pomerancblum<\/b><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Line of financing will cover 68% of investment in five farms in the Brazilian Northeast. Combined installed capacity will be 139 megawatts.<\/p>\n","protected":false},"author":2316,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[91],"tags":[],"class_list":{"0":"post-40854","1":"post","2":"type-post","3":"status-publish","4":"format-standard","6":"category-economy"},"wps_subtitle":"Line of financing will cover 68% of investment in five farms in the Brazilian Northeast. Combined installed capacity will be 139 megawatts.","_links":{"self":[{"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/posts\/40854","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/users\/2316"}],"replies":[{"embeddable":true,"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/comments?post=40854"}],"version-history":[{"count":0,"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/posts\/40854\/revisions"}],"wp:attachment":[{"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/media?parent=40854"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/categories?post=40854"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/tags?post=40854"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}