{"id":41851,"date":"2012-06-25T12:45:00","date_gmt":"2012-06-25T14:45:00","guid":{"rendered":"https:\/\/escaesco.com.br\/lab\/anba\/ethanol-petrobras-to-invest-us-1-8-bn\/"},"modified":"2024-02-21T22:28:01","modified_gmt":"2024-02-22T01:28:01","slug":"ethanol-petrobras-to-invest-us-1-8-bn","status":"publish","type":"post","link":"https:\/\/anba.com.br\/en\/ethanol-petrobras-to-invest-us-1-8-bn\/","title":{"rendered":"Ethanol: Petrobras to invest US$ 1.8 bn"},"content":{"rendered":"<p>Rio de Janeiro \u2013 Petrobras plans on investing US$ 1.84 billion in expanding ethanol production capacity in the country until 2016. Ongoing expansion of plants Nova Fronteira\/Boa Vista, Guarani, and Total will receive a combined US$ 1.05 billion of the total sum. <\/p>\n<p> These projects should boost capacity from 1 billion litres of ethanol per year to 1.7 billion litres. Projects being assessed will receive US$ 800 million, increasing capacity to more than 7 billion litres per year. <\/p>\n<p> Biodiesel should receive US$ 300 million in investment up until 2016, according to the 20121-2016 business plan. <\/p>\n<p> More than US$ 13 billion will go to gas and energy projects, of which US$ 5.7 billion will go to gas-chemical processing projects. \u201cOne of the company\u2019s priorities in coming years is the chemical processing of the gas in order to produce fertilizers. Two and a half billion dollars will be allocated to chemical processing of gas into fertilizers,\u201d said the company\u2019s Gas and Energy director Alcides Santoro.<\/p>\n<p> The remainder of gas and energy investment will go to transport of the gas produced (US$ 2.3 billion), regasification projects (US$ 1.9 billion) and electricity generation (US$ 1.6 billion), among others. The company\u2019s network expansion plans for thermoelectric production include projects such as the Baixada Fluminense Plant, due to enter into operation in late 2014.<\/p>\n<p> <b>*Translated by Gabriel Pomerancblum<\/b><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The company will boost its production capacity for the biofuel in Brazil until 2016. Projects already underway will get part of the funds.<\/p>\n","protected":false},"author":2315,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[91],"tags":[],"class_list":{"0":"post-41851","1":"post","2":"type-post","3":"status-publish","4":"format-standard","6":"category-economy"},"wps_subtitle":"The company will boost its production capacity for the biofuel in Brazil until 2016. Projects already underway will get part of the funds.","_links":{"self":[{"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/posts\/41851","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/users\/2315"}],"replies":[{"embeddable":true,"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/comments?post=41851"}],"version-history":[{"count":0,"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/posts\/41851\/revisions"}],"wp:attachment":[{"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/media?parent=41851"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/categories?post=41851"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/tags?post=41851"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}