{"id":51384,"date":"2015-06-29T15:20:00","date_gmt":"2015-06-29T17:20:00","guid":{"rendered":"https:\/\/escaesco.com.br\/lab\/anba\/petrobras-lowers-estimation-of-investments\/"},"modified":"2024-02-21T22:27:10","modified_gmt":"2024-02-22T01:27:10","slug":"petrobras-lowers-estimation-of-investments","status":"publish","type":"post","link":"https:\/\/anba.com.br\/en\/petrobras-lowers-estimation-of-investments\/","title":{"rendered":"Petrobras lowers estimation of investments"},"content":{"rendered":"<p>Rio de Janeiro &ndash; Petrobras lowered investments forecasted for the period 2015-2019 in 37%, which means US$ 90.3 billion less if compared to what was previously forecasted in the Business and Management Plan for 2014-2018. The company&rsquo;s new plan for 2015-2019 was sent this Monday (29th) to the Securities Commission (CVM, in the Portuguese acronym) with a total investment of US$ 130.3 billion for the period.<\/p>\n<p>In the new plan, the investment portfolio will prioritize projects of oil exploration and production in Brazil, with emphasis placed in the pre-salt layer. According to the company, in the other business areas &ldquo;investments are basically intended &ldquo;for&nbsp;the maintenance of operations and projects related to the shipping out of oil and natural gas production&rdquo;. It will be 86% to production development, 11% to exploration and 3% to operational support. Also, US$ 64.4 billion will be intended to new production systems in Brazil, 91% of which in the pre-salt layer.<\/p>\n<p><strong>*Translated by S&eacute;rgio Kakitani<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The company lowered the estimation of investments for the 2015-2019 period by 37%. The cuts mean US$ 90.3 billion less than the estimated figure of the last business plan.<\/p>\n","protected":false},"author":2315,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[91],"tags":[],"class_list":{"0":"post-51384","1":"post","2":"type-post","3":"status-publish","4":"format-standard","6":"category-economy"},"wps_subtitle":"The company lowered the estimation of investments for the 2015-2019 period by 37%. The cuts mean US$ 90.3 billion less than the estimated figure of the last business plan.","_links":{"self":[{"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/posts\/51384","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/users\/2315"}],"replies":[{"embeddable":true,"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/comments?post=51384"}],"version-history":[{"count":0,"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/posts\/51384\/revisions"}],"wp:attachment":[{"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/media?parent=51384"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/categories?post=51384"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/tags?post=51384"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}