{"id":58330,"date":"2017-09-27T12:34:00","date_gmt":"2017-09-27T14:34:00","guid":{"rendered":"https:\/\/escaesco.com.br\/lab\/anba\/govt-auctions-hydroelectric-plants-for-usd-3-8-billion\/"},"modified":"2024-02-21T22:26:37","modified_gmt":"2024-02-22T01:26:37","slug":"govt-auctions-hydroelectric-plants-for-usd-3-8-billion","status":"publish","type":"post","link":"https:\/\/anba.com.br\/en\/govt-auctions-hydroelectric-plants-for-usd-3-8-billion\/","title":{"rendered":"Gov\u2019t auctions hydroelectric plants for USD 3.8 billion"},"content":{"rendered":"<p>S&atilde;o Paulo &ndash; The Brazilian federal government raised BRL 12.1 billion (USD 3.8 billion) from the auction of four hydroelectric power plants operated by Companhia Energ&eacute;tica de Minas Gerais (Cemig), the power utility of the state of Minas Gerais. The auction took place this Wednesday (17) in the S&atilde;o Paulo Stock Exchange (Bovespa). <\/p>\n<p>The first plant to be auctioned was S&atilde;o Sim&atilde;o, spanning the states of Goi&aacute;s and Minas Gerais. The sole bidder and winner was China&rsquo;s Spic Pacif Energy PTY, with a BRL 7.18 billion (USD 2.2 billion) bid and a 6.51% premium. The second plant on auctionwas Jaguara, in Minas Gerais and S&atilde;o Paulo. The winner was consortium Engie Brasil Minas Gera&ccedil;&atilde;o, with a BRL 2.17 billion (USD 685.8 million) bid and a 13.59% premium. <\/p>\n<p>The Engie consortium also won the third auction, for Minas Gerais&rsquo; Miranda plant, with a BRL 1.36 billion (USD 429.8 million) bid and a premium of 22.42%. The last auction, for the Volta Grande plant in Minas Gerais and S&atilde;o Paulo, was won by Enel Brasil S.A., with a premium of 9.84% and a BRL 1.4 billion (USD 442.4 million) bid. All contracts are for 30 years. <\/p>\n<p>The federal government will spend the sum it collected on trying to make ends meet this year, with an expected BRL 159 billion (USD 50.2 billion) deficit. <\/p>\n<p><strong>*Translated by Gabriel Pomerancblum<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Four facilities operated by the Minas Gerais state utility have been auctioned this Wednesday in the S\u00e3o Paulo Stock Exchange. The funds will cover part of Brazil\u2019s fiscal deficit.<\/p>\n","protected":false},"author":2315,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[91],"tags":[],"class_list":{"0":"post-58330","1":"post","2":"type-post","3":"status-publish","4":"format-standard","6":"category-economy"},"wps_subtitle":"Four facilities operated by the Minas Gerais state utility have been auctioned this Wednesday in the S\u00e3o Paulo Stock Exchange. The funds will cover part of Brazil\u2019s fiscal deficit.","_links":{"self":[{"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/posts\/58330","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/users\/2315"}],"replies":[{"embeddable":true,"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/comments?post=58330"}],"version-history":[{"count":0,"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/posts\/58330\/revisions"}],"wp:attachment":[{"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/media?parent=58330"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/categories?post=58330"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/anba.com.br\/en\/wp-json\/wp\/v2\/tags?post=58330"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}